Bhogapuram’s Alluri Sitarama Raju International Airport began commercial operations, handling 52 air traffic movements on day one, including flights from Abu Dhabi and Singapore. Built by GMR with a 3,800-metre runway and 6 million passenger capacity, it replaces INS Dega. Aero Express electric buses connect Visakhapatnam city to the airport.
The Alluri Sitarama Raju International Airport at Bhogapuram commenced commercial flight operations on Monday, recording 52 air traffic movements on its opening day and marking a major milestone for aviation infrastructure in Andhra Pradesh.
The greenfield airport, developed and operated by GMR Visakhapatnam International Airport Limited (GVIAL) and inaugurated by Prime Minister Narendra Modi on August 1, is expected to enhance domestic and international connectivity while supporting trade, tourism and investment across North Andhra Pradesh.
According to information released by airport authorities and reported by The Hindu, the opening day saw flights connecting the region with key Indian cities as well as international destinations in the Middle East and Southeast Asia.
Union Civil Aviation Minister Kinjarapu Rammohan Naidu marked the occasion by handing over boarding passes and commemorative mementoes to passengers travelling on inaugural services.
Andhra Pradesh Chief Minister N. Chandrababu Naidu, in a post on X, described the airport's launch as a historic moment for the state, highlighting its potential to improve connectivity and create economic opportunities.
Inaugural operations connect domestic and international routes
The airport's first day of operations featured services by Air India, Air India Express, IndiGo, Scoot and IndiaOne, with aircraft receiving traditional water cannon salutes upon arrival.
Key inaugural flight movements included:
- IndiGo flight 6E 6408 from Hyderabad, which became the airport's first arriving commercial flight
- The return departure of the same aircraft as IndiGo flight 6E 9051
- IndiGo flight 6E 1443 from Abu Dhabi, marking the airport's first international arrival
- Its outbound service as flight 6E 1444
- Scoot flight TR 784 from Singapore, followed by its return journey as TR 785
The commencement of international operations on day one reflects the airport's role as a gateway connecting eastern India with overseas markets.
Built for long-term aviation growth
The Bhogapuram facility has been designed as a large-scale aviation and logistics hub.
According to GVIAL, the airport spans approximately 2,200 acres and features a 3,800-metre Code 4E runway capable of accommodating wide-body aircraft, including:
- Boeing 777
- Boeing 787 Dreamliner
- Airbus A330
- Airbus A350
- Boeing 747 aircraft
The airport has an initial annual passenger handling capacity of 6 million travellers, with plans for future expansion to support more than 40 million passengers annually.
Kanwarbir Singh Kalra, Chief Executive Officer of GVIAL, said the airport's launch was the culmination of years of planning and engineering work and would strengthen trade, tourism, investment and employment opportunities across the region.

Early passenger experience highlights connectivity challenge
The launch also marked the transition of commercial operations from the city-based INS Dega airport in Visakhapatnam to the new facility at Bhogapuram.
While passengers welcomed the modern infrastructure and faster processing experience, some noted the longer journey required to reach the airport.
Speaking to The Hindu, Vikram Penmetsa, a chartered accountant from Siripuram, said travel to the airport involved navigating traffic bottlenecks near Anandapuram Junction. However, he noted that check-in and security procedures were completed within 15 to 20 minutes and described the terminal facilities as being comparable with international standards.
Public transport network supports airport access
To improve connectivity between Visakhapatnam city and the airport, the Andhra Pradesh State Road Transport Corporation (APSRTC) has introduced dedicated Aero Express electric bus services.
Key features of the service include:
- An initial fleet of 14 air-conditioned electric buses
- Operations from 4:30 a.m. to 10:30 p.m.
- Services every 30 minutes
- Two primary routes connecting major city locations with the airport
The first route links Gajuwaka to the airport through NAD, Gurudwara, Zoo Park, Marikivalasa, Anandapuram and Tagarapuvalasa.
The second route connects Scindia, Visakhapatnam Railway Station, Dwaraka Bus Station, Siripuram, ISKCON Temple and IT Hills before joining the highway corridor.
Bus fares range from ₹50 to ₹400, depending on the boarding point.
164 AIRPORTS, BUT FEW FLIGHTS By Pradipta Guha The Ministry of Civil Aviation will tell you, with the confidence of a magician mid-trick, that India now has 164 operational airports and 13 greenfield airports since 2014. The figures roll off parliamentary replies like a victory chant. But a runway is not connectivity. A terminal is not a ticket. And an ‘operational airport’, in the official lexicon, can mean a facility where not a single scheduled commercial aircraft has landed in months. The government’s own admissions betray the illusion. Kushinagar International Airport, inaugurated with the grand promise of a Buddhist pilgrimage gateway, had no scheduled commercial flight operations as of January 2026. The ministry’s defence is a masterpiece of buck-passing: airlines decide routes based on ‘traffic demand, commercial viability’. Halwara Airport in Punjab, its terminal gleaming, sat silent. The government acknowledged ‘no scheduled flight operations’, with Air India merely ‘proposing’ to fly. Datia in Madhya Pradesh, inaugurated in May 2025, saw its lone 19-seater vanish within five months after carrying barely a thousand passengers; it now counts as ‘non-operational’. A terminal without a flight is not a gateway. It is a photo opportunity. The rot is systemic. Kalaburagi, built at over Rs 175 crore and opened in 2019, watched passenger numbers collapse from 79,143 in 2022–23 to just 7,115 in the first quarter of 2025–26 before flights ceased entirely. Pakyong in Sikkim has been suspended since June 2024. Its runway cannot handle anything larger than a small turboprop, and the government is now reduced to soliciting a nine-seater aircraft to restore a token Guwahati connection. Shivamogga, built for Rs 450 crore, lost IndiGo in May 2026, then SpiceJet in June; its last carrier, Star Air, stopped taking bookings after 21 November. A field investigation found that, of the 95 airports covered under UDAN, 15 are either closed or have had UDAN flights completely suspended. UDAN itself, the flagship scheme launched in 2016 with the soaring promise that even a person in slippers could fly, tells the story in starker arithmetic. Nearly half of its operationalised routes have been discontinued. The reasons are listed with bureaucratic candour: low passenger demand, aircraft shortage, airline withdrawals and rising fuel costs. The airport remains. The flight does not. The subsidy expires. The airline flees. The passenger, once courted with slogans, returns to the railway platform. None of this is to deny genuine success. Bhogapuram opened with 52 movements on day one. Mopa hums with domestic and international traffic. Total passenger handling capacity has risen substantially. These are real, and honesty demands that they be acknowledged. But here is the uncomfortable truth the government hopes the parade of numbers will obscure: an airport is not a vote-winning statistic. It is a public promise. When a minister stands before a ribbon and declares an airport ‘operational’ because its runway has been swept and its guards have been paid, while the airline has fled and the subsidised 19-seater has flown half-empty, he is not measuring connectivity. He is manufacturing an illusion. The 164 figure is not an aviation statistic; it is a political instrument, calibrated for the next election cycle rather than the next boarding pass. Each new terminal without a flight is a ribbon cut for a camera, a foundation stone laid for a rally, a promise made to a voter who will never board a plane from it. The government has mastered the art of inaugurating infrastructure it cannot sustain, and of calling the debris of its own UDAN scheme ‘operational’. A runway is a promise. And a promise broken at public expense, dressed up as progress in a parliamentary reply, is not governance. It is the arithmetic of deception. #UDAN #IndianAviation #AirportIllusion #CivilAviation #Connectivity #Infrastructure
— Diganta Guha (@diganta_guha) November 9, 2026
Gateway for the region
The launch of commercial operations at Bhogapuram represents one of the most significant aviation infrastructure developments in eastern India in recent years. With international connectivity already in place, a high-capacity runway and expansion plans targeting more than 40 million passengers annually, the airport is positioned to become a major aviation, logistics and economic hub for Andhra Pradesh and the wider eastern coast region.
Avionyz will continue to follow this story and share updates as more details emerge.
For more aviation news and interesting articles, like avionyz news on Facebook, follow us Instagram or youtube or x.com




Join the conversation
No comments yet
Be the first to share your thoughts!